Taishan Construction

Proposal — private & secure

Prepared for Grace

Prepared exclusively for Grace

7 VandorfStreet.

A new interlocking driveway, a restored front landscape, and considered lighting. Two design options, each shown in 3D with its own investment. Choose the one that is right for your home.

Option A

Driveway + Tree Removal

Your driveway converted to interlocking at its existing footprint, with the tree removed and the lawn restored.

Driveway + Tree Removal, view 1
After — Driveway + Tree RemovalView 1 / 7

Before & after — drag to compare

After — proposed design
Before — existing driveway
‹›
BeforeAfter
Street view
After — proposed design
Before — existing driveway
‹›
BeforeAfter
Angled view
After — proposed design
Before — existing driveway
‹›
BeforeAfter
Driveway view

Driveway — Asphalt to Interlocking

Removal of the existing asphalt and conversion of the full driveway to interlocking at its existing dimensions. Includes excavation, new compacted base preparation, installation, and cleanup — built with preparation beneath the surface.

730 sq ft · $14 / sq ft

$10,220

Tree Removal & Restoration

Complete tree removal, followed by re-sodding and restoration of the existing area so it finishes clean and blends naturally with the property.

1 · $500

$500

Option A investment

$10,720

Option B

Extension + Driveway + Tree Removal

The full interlocking driveway widened by 163 sq ft, with the tree removed and the lawn restored.

Extension + Driveway + Tree Removal, view 1
After — Extension + Driveway + Tree RemovalView 1 / 7

Before & after — drag to compare

After — proposed design
Before — existing driveway
‹›
BeforeAfter
Street view
After — proposed design
Before — existing driveway
‹›
BeforeAfter
Angled view
After — proposed design
Before — existing driveway
‹›
BeforeAfter
Driveway view

Driveway — Asphalt to Interlocking

Removal of the existing asphalt and conversion of the full driveway to interlocking at its existing dimensions. Includes excavation, new compacted base preparation, installation, and cleanup — built with preparation beneath the surface.

730 sq ft · $14 / sq ft

$10,220

Driveway Extension

Extend the new interlocking driveway by an additional 163 sq ft, built to the same base preparation and finish standard as the main driveway.

163 sq ft · $14 / sq ft

$2,282

Tree Removal & Restoration

Complete tree removal, followed by re-sodding and restoration of the existing area so it finishes clean and blends naturally with the property.

1 · $500

$500

Option B investment

$13,002

Optional upgrade — either option

Your investment

Option A + pot lights

$12,970

The Taishan Effect

Why this project is built properly.

See it before you build it.

3D visualization before construction begins, so the finished space is never a surprise.

Built properly.

Proper excavation, grading, drainage, base preparation, and installation — beneath every surface.

Warranty-backed workmanship.

Confidence after completion, with workmanship that stands behind every detail.

Clear communication.

One organized team, with a disciplined path from vision to completion.

Approval

Ready when you are, Grace.

Approving reserves your project in the build schedule with option a and pot lights at $12,970.