Taishan Construction
Proposal — private & secure
Prepared exclusively for Grace
7 VandorfStreet.
A new interlocking driveway, a restored front landscape, and considered lighting. Two design options, each shown in 3D with its own investment. Choose the one that is right for your home.
Option A
Driveway + Tree Removal
Your driveway converted to interlocking at its existing footprint, with the tree removed and the lawn restored.

Before & after — drag to compare






Driveway — Asphalt to Interlocking
Removal of the existing asphalt and conversion of the full driveway to interlocking at its existing dimensions. Includes excavation, new compacted base preparation, installation, and cleanup — built with preparation beneath the surface.
730 sq ft · $14 / sq ft
$10,220
Tree Removal & Restoration
Complete tree removal, followed by re-sodding and restoration of the existing area so it finishes clean and blends naturally with the property.
1 · $500
$500
Option A investment
$10,720
Option B
Extension + Driveway + Tree Removal
The full interlocking driveway widened by 163 sq ft, with the tree removed and the lawn restored.

Before & after — drag to compare






Driveway — Asphalt to Interlocking
Removal of the existing asphalt and conversion of the full driveway to interlocking at its existing dimensions. Includes excavation, new compacted base preparation, installation, and cleanup — built with preparation beneath the surface.
730 sq ft · $14 / sq ft
$10,220
Driveway Extension
Extend the new interlocking driveway by an additional 163 sq ft, built to the same base preparation and finish standard as the main driveway.
163 sq ft · $14 / sq ft
$2,282
Tree Removal & Restoration
Complete tree removal, followed by re-sodding and restoration of the existing area so it finishes clean and blends naturally with the property.
1 · $500
$500
Option B investment
$13,002
Optional upgrade — either option
Your investment
Option A + pot lights
$12,970
The Taishan Effect
Why this project is built properly.
See it before you build it.
3D visualization before construction begins, so the finished space is never a surprise.
Built properly.
Proper excavation, grading, drainage, base preparation, and installation — beneath every surface.
Warranty-backed workmanship.
Confidence after completion, with workmanship that stands behind every detail.
Clear communication.
One organized team, with a disciplined path from vision to completion.
Approval
Ready when you are, Grace.
Approving reserves your project in the build schedule with option a and pot lights at $12,970.